Top

2015 Gray’s Harbor Minot Peak Underground Distribution

Project:

Installation of 3 runs of 2" SDR 13.5 HDPE conduit, 3 runs of 2" schedule 40 PVC and 1 run of 2" SDR 13.5 HDPE conduit. Plowed, bored, trenched, backfilled and restored to prepare to replace deteriorated direct buried and suspended concentric neutral cables.

Magnum Power, LLC