Top

2015 Snohomish County PUD Halls Lake Transmission Line

Project:

Replace 115kV Structures from the 2-pole and 3-pole wood structures to single and 2-pole fiberglass/steel structures. Setting and framing new 70’-75’ fiberglass /steel poles with steel casings. New structures attached to 1272 AAC conductor.

Magnum Power, LLC