Gluelam Transmission Line Dayton


Building a new 7 mile 115kV transmission line near Dayton, WA. With a 4 mile 25kV distribution underbuild. Site prep work such as preparing access roads or work areas and foundation work for the unguyed steel structures. This line crosses the Patit Creek which includes sensitive areas where no equipment was allowed to ford the stream. A cultural resource monitor observed excavation in some segments of the line.

Magnum Power, LLC